Restaurant renovation in Amsterdam & Het Gooi

We renovate the kitchen, toilets and dining room of restaurants, cafés and other hospitality businesses. We plan around your opening hours, so you are closed as briefly as possible. One team does all the trades, from pipework and electrics to tiles, floors and paint.

Ceramic tiles on adhesive with a stainless steel drain

Restaurant renovation

What a restaurant renovation can include


Removing old tiles, floors and fittings

Water, waste and electrical connections in the kitchen

Wall and floor tiles in the kitchen

Renovating guest and staff toilets

New floors in the dining room

Plastering and painting walls and ceilings

New lighting points and a final clean

How we work

01

Visit

Email us what you want done, ideally with photos. We come round, measure everything and talk through when you can close.

02

Quote and schedule

You get a quote per item and a day-by-day schedule, planned around your opening hours.

03

The work

Demolition, pipework and electrics, tiling, floors and finishing, in that order and by our own team.

04

Handover

We walk through everything with you and test the taps and drains. Anything not right yet gets fixed before we close the job.

What does a restaurant renovation cost?

Every restaurant is different, so we price per job. After we have seen the space, you get a quote broken down per item, so you know what the labour costs and what the materials cost. These things make the biggest difference to the price:

Size of the kitchen and dining room in m²

How many toilets need renovating

Moving water, waste or electrical connections

Choice of tiles, floors and finishes

How long you can close, and when

Questions about restaurant renovation

What does a restaurant renovation cost?

That depends on the size of the kitchen and dining room and the work. We do not use a fixed price per m². After a visit you get a quote per item, so you see what the labour costs and what the materials cost before you decide.

How long do we need to close?

That depends on the work. We plan around your opening hours and give you a day-by-day schedule beforehand, so you know when you can reopen.

Which tiles suit a restaurant kitchen?

Ceramic wall and floor tiles that are easy to clean and stand up to water and grease, with a non-slip tile on the floor. The Dutch hygiene code for hospitality (Hygiënecode voor de Horeca) expects a kitchen that is easy to keep clean, so we take that into account when you choose materials.

Do I need a permit for a restaurant renovation?

Interior work that does not change the structure of the building usually needs no permit in the Netherlands. Structural changes, a change of use or work on a listed building usually do. Check with your municipality through the Omgevingsloket, and if you rent the premises, ask your landlord for permission first.

Can you renovate the toilets for guests and staff?

Yes. We renovate toilets from bare room to finished: a wall-hung frame with concealed cistern, pipework, tiles, the toilet and a hand basin.

Do you also renovate the dining room?

Yes. We lay new floors, plaster and paint walls and ceilings, and add lighting points, so the kitchen and the dining room are done by the same team.

Can we email you in English?

Yes. You can email us in English or Dutch. We work by email, so every question and answer stays in writing.

Last updated:

Scroll to Top