Bathroom renovation across the Netherlands

We renew your bathroom completely: strip-out, plumbing, electrics, tiling and sanitary ware. One team does it all, so you don't have to coordinate separate trades. Allow two to three weeks of work for an average bathroom.

Bathroom in Bussum with corner bath, walk-in shower and marble-look tiles

Bathroom renovation

What is included


Stripping out and removing the old bathroom

New water and waste pipes

Electrics for lighting, mirror and ventilation

Waterproofing the floor and shower area

Laying wall and floor tiles

Fitting sanitary ware, taps and vanity

Sealant and final clean

How we work

01

Survey

We measure the room, check pipes and drainage and talk through what you want.

02

Choices and quote

You pick tiles and fittings. You get a quote per item and a week-by-week schedule.

03

The work

Strip-out, installation, tiling and fitting, in that order and by the same team.

04

Handover

We test every connection and walk through the bathroom with you.

What sets the price

Every bathroom is different. The quote shows the cost per item. These are the things that make the difference.

Size of the room and square metres of tiling

Tile size: large format needs a flatter base

Moving the toilet, shower or drain

Choice of sanitary ware and taps

Condition of the subfloor and existing pipes

Bathrooms and toilets we built

Bathroom in Bussum with corner bath, walk-in shower and marble-look tiles

Bathroom renovation Bussum

Bathroom with corner bath and walk-in shower

Marble-look tiles floor to ceiling, a walk-in shower with black profile, corner bath with mosaic and a wall-hung vanity.

Toilet before and after renovation with concealed cistern and LED mirror

Toilet renovation

Toilet from bare room to finished

Stud wall with concealed cistern, wall tiles, basin with cabinet and an LED mirror. On the left, the room before we started.

Ceramic tiles on adhesive with a stainless steel drain

Tiling

Ceramic tiles with stainless drain

Tiles fully bedded on a notched adhesive layer, with a stainless steel channel drain. Spacers keep the joints even.

Questions about bathroom renovation

How long does a bathroom renovation take?

An average bathroom takes two to three weeks. If we need to move pipes or raise the floor, it takes longer. The schedule is in the quote.

Can the shower go somewhere else?

Usually, yes. It depends on the drain and the fall we can create. We check what is possible during the survey.

Can I shower during the work?

Not in the bathroom we are renovating. If you have a second shower it is easy. Otherwise we agree a solution beforehand.

Can I choose tiles and fittings myself?

Yes. You can buy them yourself or order through us. We check beforehand that everything fits and is suitable.

Do you fit underfloor heating in bathrooms?

Yes, electric or connected to the boiler. For a small bathroom, electric is often the simplest option.

What happens to the demolition waste?

We take it away. You don't need to arrange a skip.

Scroll to Top